Project description

The project provides for construction and putting into operation of two combined cycle power units of total installed capacity 200 MW. The building site is located in the area of Defanovka settlement in Tuapse region of Krasnodar Territory of the RF.
Construction of Dzhubga TPP is included in the “Program for Facilities Construction of Olympic Venues and Development of Sochi as Mountain Climate Resort”, approved by the Russian Federation Government Regulation No.991 of 29 December, 2007.
Construction took place in the mountains with high seismicity. Power plant commissioning provided the 2014 Winter Olympic Games facilities with power capacities and satisfied the demand for power in the dynamically developing South of Russia.

The Power Plant was launched in 2013.

Main equipment

  • Two gas turbine units LMS 100, manufactured by GE Energy.

Technical and economic performance

Designed electric capacity of the power generating units to be put into operation 200 MW
Installed capacity of the power generating object including put into operation of the new power generating units 200 MW
Planned annual electric power generation by the power generating unit 973 mln kW*per hour
Main project fuel Natural gas
Fuel consumption rate 284 511 th. tonne of fuel equivalent /per year
Degree of efficiency of electric power by output 41,11%
ICUF 55.53%
Specific reference fuel consumption for electric power output 299 GOE/kW*per hour